What Should be Paid Attention to When Buying Concrete Mixing Station

1. Performance label of construction concrete

From this, we can choose what kind of mixing machine to use. For example, in water conservancy projects, the forced mixing host must be selected. In addition, batching stations and storage bins should be selected according to the types of concrete materials that can be mixed.

2. Task quantity and construction period of concrete construction

Use these two parameters to select the mixing station with large specifications. Let the total task of concrete be m; The number of concrete pouring days is T; The working hours per day are h; If the utilization coefficient is K, the specification of the mixing station should be X=M/(T*H*K), where K is 0.7-0.9. In the selection, the transportation condition of finished concrete should also be considered. Such as: direct pumping or vehicle transportation. The volume of conveying vehicles is also an important basis for determining the type of mixing station.

3. Construction environment and construction object

When choosing to buy concrete mixing station, the influence of construction object and construction environment should be fully considered, so as to ensure the smooth construction and construction quality. In the following cases, we suggest that you should be prepared.

4. High concrete demand and quality requirements

When the site needs a large amount of one-time pouring, and the quality requirements are high, and there is no mixing station nearby that can be reinforced, it is best to choose two mixing stations with smaller specifications, or choose two machines with one master and one deputy.

5. In the case of inconvenient transportation

When the traffic on the construction site is inconvenient and it takes a lot of time for maintenance personnel to go in and out of the construction site, it is best to choose two-machine stations with the same small specifications or prepare enough spare parts to ensure the smooth construction progress.

6. Decentralization of construction sites

When the construction sites are scattered, but the distance between the construction sites is not too far, the transportation radius of the concrete mixing truck shall not exceed half an hour's drive, and the transportation of the dump truck shall not exceed 10 minutes' drive. It is best to use multi-job centralized mixing to improve the utilization rate of mixing station and the economic benefit of construction.

7. Quality of operators

Generally speaking, small mixing stations have simple structure and simple control system, so the requirements for operators and maintenance personnel are low. The larger stations have complex structures and high degree of automation, so the requirements for operators are also higher. Therefore, in addition to the above factors, you should also consider this factor when purchasing a mixing station.

8. Formulation selection

Under normal circumstances, manufacturers have mature product formulations, such as specifications, quantities and varieties. You can put forward your special requirements when ordering products. We will try our best to meet your requirements. However, when purchasing products, it is forbidden to be greedy for perfection, which will cause unnecessary waste in the economy. In addition, when purchasing products, besides referring to the prices of different manufacturers, we should also pay special attention to the preparation list of different manufacturers. In addition to the above specifications, varieties and quantities, the most important thing is the manufacturer of supporting parts. To sum up the above items, you can always choose the model that suits you best. When choosing a model, don't pursue the best, but pursue the one that is most suitable and meets your needs, because such a choice is the most economical and effective.