How to Maintain Concrete Mixing Plants in Winter

When winter comes, the weather is getting colder and colder, but the use of concrete mixing station will not stop. However, when the temperature is low in winter, attention should be paid to the maintenance of concrete mixing station. So how should it be maintained in winter?

1.After the concrete mixing station is shut down, it is necessary to discharge all the liquid in the water tank from the water pump, water tank and admixture as soon as possible, so as to prevent the water from freezing due to the damage of the residual machinery and pipelines in the water tank, or the startup can not be started normally.

2.Concrete mixer to stop working for more than 4 hours should be compressed water and air bag water row, prevent water condensation after compression.

3.Diagonal belt if there is a sprinkler or belt conveyor idling should allow a period of time after the end of production, the cleaning belt scraped to the surface of the water, prolong the service life of the belt conveyor, vertical tension weight should be reduced and adjusted accordingly.

4.When the horizontal conveyor belt is not used for a long time, it should be started regularly, because water will drip from the bunker to the level of the conveyor belt.

5.The electrical components of concrete mixing station in each production site machinery and control system work half an hour before opening.