Singapore 90M3/H Foundation Free Concrete Batching Plant Has Been Completed

Recently, the foundation-free concrete mixing station in Singapore has been completed. According to reports, the mixing plant is fully automatic in feeding and batching, with unattended production and intelligent and efficient operation. At present, the whole project has entered the trial operation stage, and it already has the concrete production capacity.

What is A Foundation-free Concrete Mixing Station

The foundation-free cement mixing plant needs to do the foundation, but it only needs to do a simple site hardening, which saves the time and cost of doing the foundation, and can also ensure the stable and safe placement of equipment. Later, during the transition, disassembly is also more convenient. The foundation-free mixing station adds a foundation-free frame on the basis of the standard station, which enhances the durability of the equipment without affecting the output.

Mixer Discharging Volume: 1500L
Mixer Feeding Volume: 2000L
Mixer Motor Power: 30×2kw
Discharging Heigh: 4.1m
Aggregate Batching Machine Volume: 7×3m3
Cycle Period: 60s
Max. Aggregate Size: 80/60mm
Cement Silo(optional): 2×100ton(double layer)

Characteristics of Foundation-free Concrete Mixing Station

The standard foundation-free concrete mixing plant equipment will cost a little more than the common standard equipment and occupy a little more space. Therefore, in the later period, according to the customer's site and budget, we have an economical integrated folding foundation-free mixing station, which is convenient for transportation, saves space and reduces budget. Choose different equipment for different needs.

Difference Between Foundation-free Concrete Mixing Station And Fixed Concrete Mixing Station

Generally, common concrete batching plant need to lay a solid foundation to ensure the stability and durability of the mixing station. Do the foundation, according to the size of the mixing plant equipment used, the form of batching station, etc., to determine the depth of the foundation. The time to do the foundation is usually about 5-9 days. After the foundation is completed, the equipment can be installed and debugged. You can't move often in the later period.

What Are the Types of concrete Mixing Stations

There are many forms of concrete batching plants, such as horizontal arrangement and L-shape. The size can be directly standard or customized according to the size of the site, and the color can also be customized; From the use of occasions, there are engineering mixing stations, commercial mixing stations, mobile mixing stations, foundation-free mixing stations, high-grade mixing stations and so on. For more details, please contact us freely.