What If It Rains Suddenly When Pouring Concrete? Stop or Not?
Recently, I can always see workers complaining that it rains as soon as concrete is hit, and this job can't be done! It's been raining, and the concrete can't be hit. What about the construction period? What should I do if I stop or stop in the middle of pouring concrete? In order to avoid unnecessary losses, it is necessary for us to understand the problems encountered in rainy season construction and their solutions. I. The rainy season construction should do the following work: 1. The sand silo should be well drained. 2. Means of transport should have rain-proof and anti-skid measures. 3. The pouring bin surface shall be provided with rain-proof measures and waterproof covering materials. 4. Increase the determination times of aggregate moisture content and adjust the mixing water consumption in time. II. When pouring in light rain, the following measures should be taken: 1. Appropriately reduce the concrete mixing water consumption and the slump of concrete at the outlet, and appropriately reduce the water-binder ratio of concrete when necessary; 2. Strengthen the drainage in the warehouse and...